Electric Vehicle Charging Infrastructure Analysis Informs City Decision

Electric vehicle charging station display

In a January, 2020, Re-Know Minute, the City announced its purchase of the first electric vehicles in its fleet. The City of Reno is the proud owner of a handful of Nissan Leafs being used by three separate departments. Two of the units are in Business Licensing Compliance, one is in Capital Projects, and the fourth is in Parking Enforcement. The Leafs were chosen due to their positive ROI. To ensure the City continued to be diligent in its decision making, a study was commissioned and provided under a NV Energy technical assistance program, to evaluate potential sites for additional EV charging stations.

The study came together in three fairly simple steps:

  1. City staff provided NV Energy with a list of sites it was interested in adding EV charging infrastructure to.
  2. The NV Energy contractor under the program evaluated the annual consumption cost and load profile at each site.
  3. The NV Energy contractor held a call with City Staff to go over the results, and provided in-depth analysis and graphs of annual load, based on the time of year.

This process allowed City Staff to determine the best time of day to charge the vehicles and if an electric vehicle rate was a good option. Based on the analysis, the City is moving forward with adding more electric vehicle charging stations, and will be moving to a new rate.

“We wanted to make sure we are charging the vehicles at the most optimal time and at the sites with the easiest access for our staff. The site selection analysis performed by NV Energy was instrumental in this process,” Zac Haffner, Fleet Maintenance, Operations and Maintenance Manager

The new rate will allow the City to save money at these sites, while also adding electric load. One site also has solar, so the City will take full advantage of carefully using electricity based on its solar production profile.

“One of the selected sites is perfect for EV charging because the existing solar array is covering a large portion of our summer peak load, so we can switch to an EV rate and see a net positive impact,” Suzanne Linfante, Sustainability Program.

This action aligns with the City Sustainability Plan, Priority 1.5, to reduce emissions from City fleet. The City is committed to actions that will not only help us reach our emissions reductions goals, but increase operational efficiencies.

Comments are closed.