Winter is in full swing and we have had a few snow storms in the mountains over the past few weeks. It’s only a matter of time before snow accumulates on the valley floor, so we want to provide some information about the City of Reno’s snow plowing process. The City’s street system contains approximately 2,361 lane miles, divided into 19 snow and ice removal routes with Priority 1, 2, and 3 routes. Priority 1 are multi lane routes and heavily traveled single lane routes; Priority 2 are bus routes; and Priority 3 are all remaining roads. These priorities dictate brining and snow plow routes during winter weather. See Snow and Ice Control Routes for a map of the 19 areas and priority routes.
Salt Brine
As of the 2014-15 winter season, the City of Reno began using a new method to treat streets for snow and ice. Prior to a snow or ice event, City crews apply salt brine to the Priority 1 streets, bridges and inclines. The brine consists of a clear solution of tap water and sodium chloride (road salt), mixed in concentrations of 24 percent salt, and has a freezing point of -6º F. Salt brine is applied to the roadway to prevent snow from bonding to the streets, making it easier and safer to plow. Brine is up to 20 times more effective than salt and sand and is labor efficient since it is applied during normal operating hours prior to the arrival of the storm. It is also very useful because it does not require cleanup after the snow event, unlike sand which must be swept up by street sweepers. See Salt Bring FAQs for more information.
Snow Plow
Plowing operations typically begin when the snow depth reaches 4 or more inches on streets. Snow plows may hit main street intersections before 4 inches of snow accumulation to address icy conditions with a sand and salt mixture. Most of the plowing occurs in the higher elevation routes and outlying areas due to the fact that these areas receive the most snow accumulation.
The City’s snow and ice-control material is primarily a mixture of salt and sand along with salt brine which is used as a pre-treatment for grades and bridges to assist in keeping these areas open.
Maintenance & Operations has a total of 50 snow plow operators. As needed, crews are scheduled to work two 12-hour shifts for 24 hours/day service.
To view routes that are not maintained by the City of Reno: Washoe County has a wonderful resource called Quick Map. Read and close the Disclaimer page and then search for your area.
If you have additional concerns or questions, contact Reno Direct at renodirect@reno.gov or by calling 775.334.4636 (INFO).
Visit Reno.Gov/Snow for more information.