City of Reno “Tuning” up Buildings to Save Energy

Inside Fire Department Garage with Fire truck

In 2017, the City of Reno joined the U.S. Department of Energy’s Better Buildings Challenge, committing to reduce energy and water use 20 percent by 2025 in 51 facilities. The first step in meeting this challenge was to benchmark energy and water use in these facilities using the ENERGY STAR Portfolio Manager, an online tool designed to measure and track energy and water consumption. Benchmarking building data allowed the city to look at historical energy use to identify the best opportunities to improve performance through energy efficiency measures. Increasing energy efficiency will reduce climate pollution associated with city operations, and lead to operational savings for the city.

Fifteen buildings were identified that would benefit from a building “tune-up,” including Reno’s 14 fire stations, the main police station, and the Evelyn Mount NE Community Center. Most of these buildings are older with dated building systems. To tune-up the buildings, the city will use a process called retro-commissioning. Retro-commissioning is the process of testing and adjusting building systems to ensure that fundamental building systems are calibrated and operating as required to deliver functional and efficient performance.

The project goals are not only to improve energy performance and operational efficiency; the goals also include enhancing occupant health and comfort, which is particularly important in fire stations where Reno’s fire fighters reside while on duty.

To help cover the cost of the retro-commissioning project, the city applied for and received a grant from the Nevada Governor’s Office of Energy. The grant will cover the costs of the project and, according to a 2009 Lawrence Berkley Lab study, A Golden Opportunity for Reducing Energy Costs and Greenhouse Gas Emissions save the city approximately 16% annually on the energy costs for these buildings. Median costs for retro-commissioning projects is $0.30/ft2 and median savings are $0.29/ft2 per year, and the median payback period is 1.1 for existing buildings. The city’s modeled project costs and savings align with these projections.

NV Energy Makes Retro-Commissioning Even More Cost Effective

NV Energy announced a new Commercial Energy Services incentive program that covers the cost of retro-commissioning projects. You can find the incentive program details in NV Energy’s Commercial Energy Services 2018 Retrofit Specifications guide.

Retro-commissioning can help building owners and facilities managers to meet the goals of ReEnergize Reno, an ambitious program to improve the efficiency of commercial, industrial, and multifamily buildings 20% by 2025. The program will help to cut energy and water waste in large buildings, and reduce climate pollution in our community. You can find out who has joined ReEnergize Reno by reviewing the Participant Profiles.

Don’t Forget to Join us for our Next Workshop

High Performance Green Building – Preventative Maintenance Workshop

Increasing Building Performance: Key Concepts

Date:              11/27/2018 9:00 – 10:30 AM

Location:      Innevation Center, 450 Sinclair St.

Take a look at our new ReEnergize Reno video! Check out the man in the mask at the end – he might be someone that you know well.

For more information, contact ReEnergize@reno.gov.

Comments are closed.